+49 89 949 11528

Log in or Register

  • Messe München International Webshop
  • Shopping cartShopping Cart (0)
  • SearchSearch
    Search

Electrical connections halls

 

The power is supplied via a TN-S system (3 phases, 1 neutral conductor, 1 earthed conductor).
In the event of distributor panels from MMG being used, the earthing work may only be carried out by an MMG-accredited service partner qualified to do the job. Depending on model and type of stand construction, stand may require connection to the protective conductor (earthing/equipotential bonding) in accordance with DIN ENVDE 0100 (see also Instruction Sheet "Notice on Electrical Installation Work on Exhibition Stands").